New Haifa Bay Port

Israel, Haifa

infrastructures

Completed

In 2019, Ashtrom Group, together with a partner, completed the construction of the new Haifa Bay Port for the Israel Ports Company. The construction of the port is regarded as one of the largest, most complex and important projects in Israel, confronting the Group with engineering and logistical challenges also on account of its location, the changing climatic conditions and the need to safeguard the ecological environment.  

890Dunams

Port area

3km

Breakwaters

2km

Length of pile walls

New Haifa Bay Port
New Haifa Bay Port

Engineering and Environmental Challenges in a Mega Marine Project 

The new Haifa Bay Port was built in order to meet the need to expand the capacity of the country’s ports in view of the increased volume of trade and the need to adapt the port to the fast changing size of the ships plying international trading routes. The project included development of the port lands, construction of breakwaters, the erection of quays, opening a terminal and the provision of additional structures in the harbour area.

Before starting work a marine survey of the project area was undertaken with a view to preventing harm to the marine environment. The marine survey included maritime measurements and reviews of subterranean conditions regarding seabed levels and types. At the same time a comprehensive operation to stack rocks in dedicated piles was carried out, while taking the utmost care to comply with environmental regulations.

Included in Construction Operations:  

  • Construction of breakwaters - extension of main breakwater by about 880 metres by casting rocks from special barges as well as building a secondary breakwater to an overall length of about 2.1 km., carried out via the sea and the shore and comprising 1.5 km. of rock and 600 metres of caissons.
  • Pile walls driven in over a length of about 2 km. to form the operational area of the new harbour, using special barges.
  • Layout of operational area of 890 dunams - for this purpose an area of the sea was “reclaimed” by pouring in enormous quantities of sand excavated from the breakwaters and other areas of the port. The sand was in fact trapped between the pile walls and the secondary breakwater, preventing its escape and aiding its accumulation up to the formation of a sandy land area above sea level. Following “reclamation” of the harbour area, the sand was compacted until a firm land area was obtained enabling works to proceed.
  • Construction of 20 caissons (cast concrete) with a concrete volume of approx. 2,000 cu.m. that were flooded and floated into position at the end of the breakwater.
  • Laying out of operational area - Paving, setting up operational bridge cranes, container unloading and creating logistic areas etc.
עגורנים הניצבים בנמל המפרץ חיפה Cranes Standing at the Haifa Port
עגורנים הניצבים בנמל המפרץ חיפה Cranes Standing at the Haifa Port
מתחם הנמל במפרץ חיפה The Haifa Bay Port Complex
 מתחם הנמל במפרץ חיפה The Haifa Bay Port Complex
עגורנים הניצבים במתחם הנמל במפרץ חיפה Cranes Standing in the Haifa Port Complex
עגורנים הניצבים במתחם הנמל במפרץ חיפה Cranes standing in the Haifa Port Complex.
הכשרת האזור התפעולי במתחם הנמל Preparation of the Operational Area in the Port Complex
הכשרת האזור התפעולי במתחם הנמל Preparation of the Operational Area in the Port Complex
ביצוע עבודות לבניית הנמל Execution of Construction Works for the Port
ביצוע עבודות לבניית הנמל Execution of Construction Works for the Port
הקמת מתחם הנמל במפרץ חיפה The Establishment of the Port Complex in Haifa
הקמת מתחם הנמל במפרץ חיפה The Establishment of the Port Complex in Haifa
אזור פריקת מכולות במתחם הנמל The Container Unloading Area in the Port Complex
אזור פריקת מכולות במתחם הנמל The Container Unloading Area in the Port Complex
בניית שוברי גלים במתחם הנמל Construction of Breakwaters in the Port Complex
בניית שוברי גלים במתחם הנמל Construction of Breakwaters in the Port Complex
עבודות לבניית שוברי גלים Works for the Construction of Breakwaters
עבודות לבניית שוברי גלים Works for the Construction of Breakwaters
הכשרת האזור התפעולי במתחם מפרץ חיפה Preparation of the Operational Area in the Haifa Bay Complex
הכשרת האזור התפעולי במתחם מפרץ חיפה Preparation of the Operational Area in the Haifa Bay Complex
בניית שובר גלים במפרץ חיפה Construction of a Breakwater in Haifa Bay
בניית שובר גלים במפרץ חיפה Construction of a Breakwater in Haifa Bay